MRsamdol;787803 said:From day 1 you got the car to the transformation now... your ///M is awesome! OEM+ look is the best!
seewai;787880 said:Update:
8. aFe stage 2 Pro 5R air intake system - install date set at 09h00 on 04 Dec 2012 at club vendor Devillian Motorsport workshop.
I didn't manage to do a dyno before hand though, so the figures & curves will remain a mystery. I'll see if it's possible to get Damien to get it done for me over here in SG.
Cheers.
seewai
haywire;784165 said:Bonnet liner needs attention at the bottom there...
Some fish line can help, just saw on Vixx's car.
seewai;784133 said:And yes I'm satisfied with the paint job. Waxed before I collect the car, feels as soft as baby's skin. Thin layer of dirt develop within couple of hours. A quick 5-minute cleanup would last for another 3-4 hours before another layer of thin dirt coated him again.
But they did not fix back the co-driver's side door handle properly, unable to open from inside.
Otherwise I have no regrets.
Damage :-
1. RM3k for the full car paint job
2. few hundred for some consumables / loose items.
Satisfaction :- 9.9/10
Some shots in front of my hut before upcoming heavy downpour....
Upcoming small projects 2013 that I could think of currently.....
1. short-shifter + shorter illuminated knob to replace existing stock illuminated stick
2. aFe air filters to replace existing air boxes L+R
seewai;784201 said:Just let him take all his time necessary and I'm confident he could get the job very much well done.
bro for item no 2, how did they do it. they fixed the vapor barrier is it? like haywire indicated in his thread. one thing i dont understand if we seal the barrier, then how the water will come out? mine need to be fixed as well.seewai;792877 said:No plans for UDM#4 bro. I'd not be able to sustain the wallet-bleeding.
Update 28Dec2012
Spent 2pm-6.30pm at Optimum, things sorted out:
1. fuel smell at cabin, changed left fuel float (45 mins I guess)
2. water sipping in both rear doors - fixed (3 hrs)
3. fuel door lock not functional - fixed (45 mins)
Above timing are estimates, my temperature was at 39.9C the entire afternoon. Napping whenever there's opportunity.
huskar3399;792897 said:bro for item no 2, how did they do it. they fixed the vapor barrier is it? like haywire indicated in his thread. one thing i dont understand if we seal the barrier, then how the water will come out? mine need to be fixed as well.
seewai;793077 said:Being absent-minded, I always jot down or snap-a-pic car park location. Yesterday I felt something funny when I wanted to take down where I parked, stunned for couple of seconds, only realized it.